Global Geology
         Home |  About Journal  |  Editorial Board  |  Instruction  |  Subscriptions  |  Contacts Us  |  Chinese
2019, Vol. 22(3): 167-178    DOI: 10.3969/j.issn.1673-9736.2019.03.04
Structural mechanism and construction method of mud and water inrush in Xiangyun tunnel of Guangtong-Dali railway
WANG Yawei
Faculty of Geosciences and Environmental Engineering, Southwest Jiaotong University, Chengdu 611756, China
Received 2018-08-20  Revised 2018-11-25
Supporting info
Copyright  ©  GLOBAL GEOLOGY
Address:No.938 Ximinzhu Street, Changchun 130026,China   TEL: 0431-88502587 Support by Beijing Magtech Co.ltd   support@magtech.com.cn