|
2010, Vol. 13(2): 79-84 DOI: | ||
Experimental study on improving collapsible loess with cement | ||
SHAN Bo1, WANG Changming1, DONG Quanyang1, TANG Ling1, ZHANG Guangyi2 and WEI Jiaming1 | ||
1. College of Construction Engineering, Jilin University, Changchun 130026, China; 2. Bridge Engineering Co. , Ltd. of China Railway No. 1 Engineering Group, Chongqing 401121, China | ||
Received null Revised null | ||
Supporting info | ||
|