Global Geology    2020 23 (3): 191-198   ISSN: 1673-9736  CN: 22-1371/P  

Influence of wettability of shaly sandstone on rock electricity parameters
ZHAO Yongqiang1, PAN Baozhi1, SI Zhaowei2, LIN Fawu2
1. College of Geo-Exploration Science and Technology, Jilin University, Changchun 130026, China;
2. Petro China Jidong Oil Field Company, Tangshan 063000, China
收稿日期 2020-02-26  修回日期 2020-04-20  网络版发布日期 null
参考文献  Archie G E. 1942. The electrical resistivity log as an aid in determining some reservoir characteristics.Trans AIME,146(1):54-62.
Han X H, Yang L, Hou Q Y,et al. 2007. A new method for making artificial rock of unconsolidated sandstone cemented by dispersed shale.Progress in Geophysics,28(6):2944-2949. (in Chinese with English abstract)
Ji L, Chen K G, Wang G,et al. 2009. Study on wettability mechanism of rock.West-China Exploration Engineering,21(7):100-102. (in Chinese with English abstract)
Liang W L. 2008. Study on preparing artificial cores.Petro-leum Instruments,22(2):72-74. (in Chinese with English abstract)
Tang R Q, Lu Y. 1986. Preparation and Research of LC Artificial Core.Oil Drilling & Production Technology,8(5):75-79. (in Chinese)
Tang R Q. 1994. Manufacturing and research of GM artificial rock samples.Compound Oil and Gas Field,5(3):50-53. (in Chinese)
Tang R Q, Zeng Y H, Yao F Y. 1998. The manufacture and study if HNT artificial rock sample.Oil Drilling & Production Technology,20(1):98-102. (in Chinese with English abstract)
Trantham J C,Clampitt R L. 1977. Determination of oil saturation after waterflooding in an oil-wet reservoir the North Burbank Unit, Tract 97 Project.Journal of Petroleum Technology,29(5):491-500.
Wang Z W, Li X F, Cheng S Q,et al. 2006. Influential factors on phase chance of condensate gas in porous Media. Natural Gas Industry,29(1):90-92. (in Chinese with English abstract)
Wen Y C. 2018. Study on the characteristics of core permeability and relative permeability curve:master's degree thesis. Beijing:China University of Petroleum (Beijing). (in Chinese with English abstract)
Xiong Y, Xu H G, Wang Y Q,et al. 2018. Progress of physical research on domestic artificial cores.Oil & Gas Exploration and Development,36(1):55-61. (in Chinese with English abstract)
Xu H B, Liu L, Li J G. 2011. The manufacturing methods of artificial sandstone core in Daqing oilfield. Science Technology and Engineering,11(30):7344-7348. (in Chinese with English abstract)
Yu B, Song Y J, Jia G Y,et al. 2006a. Design and making of synthetic cores for laminated and dispersed shaly sands.Journal of Daqing Petroleum Institute,30(4):88-90. (in Chinese with English abstract)
Yu B, Song Y J, Han Y X,et al.2006b. Experimental measurement of synthetic core samples for laminated and dispersed shaly sands.Journal of Daqing Petroleum Institute,30(4):91-94. (in Chinese with English abstract)
Zhang N Y. 2016. Production and Application of Daqing Oilfield Xingshugang artificial sandstone cores:master's degree thesis. Daqing:Northeast Petroleum University. (in Chinese with English abstract)
Zhao L C. 2017. Research progress in wettability measurement of low permeability reservoir.Petrochemical Industry Application,36(8):1-6. (in Chinese with English abstract)
Zhou C L, Zhu C A, Wang Y Q,et al. 2017. Study on the development of man-made core and the influencing factors of permeability.Petrochemical Industry Application,36(9):85-89. (in Chinese with English abstract)

通讯作者: PAN Baozhi