2019, Vol. 22(3): 167-178    DOI: 10.3969/j.issn.1673-9736.2019.03.04
Structural mechanism and construction method of mud and water inrush in Xiangyun tunnel of Guangtong-Dali railway
WANG Yawei
Faculty of Geosciences and Environmental Engineering, Southwest Jiaotong University, Chengdu 611756, China
收稿日期 2018-08-20  修回日期 2018-11-25
Supporting info