Study on mine earthquake activity rules for Laohutai coal mine in Fushun of Liaoning

HAN Xiaomin, CHEN Li, SUN Wenda

世界地质(英文版) ›› 2011, Vol. 14 ›› Issue (2) : 102-105.

PDF(215 KB)
PDF(215 KB)
世界地质(英文版) ›› 2011, Vol. 14 ›› Issue (2) : 102-105.
论文

  • HAN Xiaomin1, CHEN Li1, SUN Wenda2
作者信息 +

Study on mine earthquake activity rules for Laohutai coal mine in Fushun of Liaoning

  • HAN Xiaomin1, CHEN Li1, SUN Wenda2
Author information +
文章历史 +

Abstract

According to earthquake data of Fushun earthquake administration,the seismic analysis and statistical methods are utilized in order to analyze earthquake frequency,“b”-value timing and energy creep trends in Laohutai coal mine. By using least squares linear regression method,the relational expression between frequency and magnitude of mine earthquake in Laohutai coal mine is given. And the possible largest magnitude mine earthquake inferred has also been calculated. And this paper also provides a theoretical basis for further study of mine earthquake activity.

Key words

mine earthquake / earthquake frequency / energy creep curve / “b”-value method / magnitude prediction

引用本文

导出引用
HAN Xiaomin, CHEN Li, SUN Wenda. [J]. 世界地质(英文版). 2011, 14(2): 102-105
HAN Xiaomin, CHEN Li, SUN Wenda. Study on mine earthquake activity rules for Laohutai coal mine in Fushun of Liaoning[J]. Global Geology. 2011, 14(2): 102-105

PDF(215 KB)

Accesses

Citation

Detail

段落导航
相关文章

/