Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surrounding rock and damage forms of the tunnel in the studied area, the author analyzed the geological and structural characteristics of mud and water inrush in tunnel and obtained their construction type. Meanwhile, the advanced water detection under the complex geological conditions was studied by using induced polarization method, transient electromagnetic method and three-dimensional seismic method, it can be concluded that the water-rich fracture zone exists within the detection range with a risk of large mud and water inrush disaster. The concrete construction treatment measures are put forward:①cement-water glass binary slurry is selected as the material for ground and hole grouting, its advantage is that the gel time can be controlled, and it has certain grout ability in the strata with large permeability coeffcient, which is conducive to excavate construction immediately after grouting. ②applying the mature retrograde grouting construction can reduce grouting time and improve the excavation efficiency.
Abstract
Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surrounding rock and damage forms of the tunnel in the studied area, the author analyzed the geological and structural characteristics of mud and water inrush in tunnel and obtained their construction type. Meanwhile, the advanced water detection under the complex geological conditions was studied by using induced polarization method, transient electromagnetic method and three-dimensional seismic method, it can be concluded that the water-rich fracture zone exists within the detection range with a risk of large mud and water inrush disaster. The concrete construction treatment measures are put forward:①cement-water glass binary slurry is selected as the material for ground and hole grouting, its advantage is that the gel time can be controlled, and it has certain grout ability in the strata with large permeability coeffcient, which is conducive to excavate construction immediately after grouting. ②applying the mature retrograde grouting construction can reduce grouting time and improve the excavation efficiency.
关键词
mud and water inrush /
geological model /
Xiangyun tunnel /
Guangtong-Dali railway /
structural mechanism /
construction method
Key words
mud and water inrush /
geological model /
Xiangyun tunnel /
Guangtong-Dali railway /
structural mechanism /
construction method
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
Dreybrodt W. 1990. The role of dissolution kinetics in the development of karst aquifers in the limestone:a model simulation of karst evolution.Geology,98(5):639-655.
Dreybrodt W. 1996. Principles of early development of karst conduits under natural and man-made conditions revealed by mathematical analysis of numerical models.Water Resources Research,32(9):2923-2935.
Fu Z Z. 2013. Advanced water detective prediction and disaster governance in Bauxite mine:master's degree thesis. Hunan:Central South University. (in Chinese with English abstract)
Gupta S K, Cole C R, Pinder G F. 1984. A finite-element three-dimensional groundwater model for a multiaquifer system.Water Resources Research,20(5):553-563. (in Chinese with English abstract)
He F L, Chen C Z. 2005. Geology prediction technology in railway tunnel construction.Journal of Railway Engineering Society, (S1):440-447. (in Chinese with English abstract)
He F L, Li C S, Chen C Z. 2001. Prediction and prediction technology of water flooding in large tunnel in karst area.Hydrogeology and Engineering Geology, (5):21-23. (in Chinese with English abstract)
He F L, Zhang Y C. 2011. Geological hazards and bad geological bodies in tunnel construction and their prediction.Chengdu:Southwest Jiaotong University Press, 31-36. (in Chinese)
Li H T. 2007. The technology of suddenly gushing water in Geleshan tunnel.Shanxi Architecture,(17):335-336. (in Chinese with English abstract)
Li L P. 2009. Study on catastrophe evolution mechanisim of last water inrush and its eengineering application of high risk karst tunnel:doctor's degree thesis. Jinan:Shandong University. (in Chinese with English abstract)
Li J J. 2010. Treatment technology of pouring mud and inundation for the extrusion section of Daxiangling tunnel.Railway Construction Technology, (8):27-30. (in Chinese with English abstract)
Liu G Y. 2016. Groundwater reservoir and its types.Journal of Hebei GEO University, (1):54-56. (in Chinese with English abstract)
Lin C N, Li L P, Han X R. 2008. Prediction method of tunnel water inrush in complex karst area.Chinese Journal of Rock Mechanics and Engineering, (7):1469-1476. (in Chinese with English abstract)
Luo X W. 2014. Study on disastrous structures and models of water-burst and mud-burst in deep and long tunnel. master's degree thesis. Beijing:China Academy of Railway Sciences. (in Chinese with English abstract)
Meng Y, Lei M T. 2003. The advance and suggestion for the study ondischarge rate in karst tunnel gushing.Carsologica Sinica, (4):38-43.(in Chinese with English abstract)
Niu B J, Wu G. 2017. Report of key technical research on long tunnel in Sanjiang fold system. Lanzhou:China Railway 21 Bureau Group Co., Ltd. (in Chinese)
Pu C S. 2014. Application and outlook of detection, prevention and control technique of coal mine water disaster.China Coal,40(7):100-107,121.(in Chinese with English abstract)
Qian X P. 1990. The type of water storage structure in China. Beijing:Science Press,1-7. (in Chinese)
Sun G M, Zhang M Q. 2005. Grouting material and its proportion selection in Yuanliangshan tunnel.Tunnel Construction,(S1):82-85.(in Chinese with English abstract)
Wang J X, Yang L Z, He J. 2001. Hydrogeological analysis and engineering application of karst surge water model in large underground engineering.Hydrogeology and Engineering Geology, (4):49-52. (in Chinese with English abstract)
Wang S R, He M C, Liu C W. 2006. Analysis and control technology of karst tunnel water inrush disaster.Journal of University of Science and Technology Beijing, (7):613-618. (in Chinese with English abstract)
Yang Z R. 2011. Analysis on the principle of sleeve valve pipe grouting to reinforce stratum. Science & Technology Information,(8):781-783. (in Chinese with English abstract)
Zheng G P. 2019. Application of TST and resistivity method in advance geological prediction of TBM Tunneling.Guangdong Water Resources and Hydropower, (2):79-83. (in Chinese with English abstract)
Zuo Q K. 2011. Research on waterbust mechanism and prevention measures in Dashan freeway tunnel:master's degree thesis. Chengdu:Chengdu Univerisity of Technology. (in Chinese with English abstract)
基金
Supported by Project of China Railway 21 Bureau Group Co.,Ltd. (No.XJD20170815007).