diversion project
diversion tunnel
radioactivity survey
radioactivity measurement
Wendegen
Authors
WANG Wen-hua
LIU Jing-hua
YANG Jia-ming
WANG Hong-fei
OU Wei-ming
PubMed
Article by Wang W
Article by Liu J
Article by Yang J
Article by Wang H
Article by Ou W

Radioactivity survey and evaluation for the Wendegen diversion tunnel of Chouer to Liao River project

WANG Wen-hua1, LIU Jing-hua2, YANG Jia-ming3, WANG Hong-fei2, OU Wei-ming2

1. College of Earth Sciences, Jilin University, Changchun 130061, China;
2. College of Geo-exploration Science and Technology, Jilin University, Changchun 130026, China;
3. China Water Resources Northeast Survey Design Research Co., Ltd., Changchun 130031, China

Abstract��

Based on the comprehensive radioactivity survey for the chosen diversion project tunnel line, several measurements and analyses were carried out, e.g. the ground gamma ray spectrum measurement, ground gamma dose rate measurement, soil radon concentration measurement, measurement of radon exhalation rate on rock surface, and content analysis of radioactive element uranium, radium, thorium and potassium for the drillcore samples. The results showed that the mean value of radionuclide content of the geological bodies along water diversion tunnel line are:U 1.56×10-6,Th 14.12×10-6 and K 2.16%. The mean value of radioactive elements in drillcore are:U 32.34 Bq/kg,Ra 35.68 Bq/kg,Th 35.29 Bq/kg and K 865.65 Bq/kg. The ground gamma dose rate is 90.42 nGy/h, the mean soil radon concentration is 4 272.1 Bq/m3, and the average radon exhalation rate of rock is 4.01×10-2 Bq/m2·s. The possible irradiation dose to the construction personnel is 0.759 mSv, which is calculated from the irradiation and the radiation based on outside and inside measurements, the results showed that the radiation levels of the survey area were lower than 1 mSv/a, which is the national dose limit for the public, indicating that the construction of water conveyance tunnel of water diversion project is in the safe radiation range.

Keywords�� diversion project   diversion tunnel   radioactivity survey   radioactivity measurement   Wendegen  
Received 2017-09-12 Revised 2018-01-29 Online:  