[an error occurred while processing this directive] | ������� 2016, 35(4) 1185-1194 DOI: ISSN: 1004-5589 CN: 22-1111/P | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
����Ŀ¼ | ����Ŀ¼ | ������� | ������ [��ӡ��ҳ] [�ر�] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
���� |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
��ˮ������Ϊԭλ�������Ĺ�����Ƽ�Ӧ�� | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
��ʿ��, ���Ѻ�, ��ǿ, ����, �ܿ�, ��˼Զ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
���ִ�ѧ ���蹤��ѧԺ������ 130026 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ժҪ��
Ϊ��Ч��������ҳ��ԭλ��������ͽ�Լ��ҳ��ԭλ���ɵijɱ����轫���õĽ�ˮ�������Ϊԭλ�����������ݽ�ˮ����ԭλ����������ṹ�������ԣ���ũ����ҳ��ԭλ�����ȵ����鹤�̻��صĽ�ˮ�����칤�ս�������ƺ��Ż���ͬʱ�з���ƫ����ʽ�ܸ��װ�ü���צʽ�ܴ���װ�����ڰι�ʩ��������ʵ��֤�����ù��վ��в����������Ч�Լ��۸�������ص㡣ƫ����ʽ�ܸ��װ�ü���צʽ�ܴ���װ��Ӧ���ڽ�ˮ�������У���ȡ�������Ч���� | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
�ؼ����� ������ ��ˮ�� ����� ������ ��� | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Process design and application of dewatering wells remould to in-situ production wells | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
LV Shi-Dong, SUN You-Hong, LI Qiang, GUO Wei, ZHOU Ke, WANG Si-Yuan | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
College of Construction Engineering��Jilin University��Changchun 130026��China | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Abstract:
In order to effectively expand the area and reduce the cost of the in-situ exploration of oil shales�� abandoned dewatering wells need to remoulded to in-situ production wells�� In consideration of the similarity of well structures between drainage wells and in-situ production wells��several designs and optimizations were employed to the remoulding methods of drainage wells located in the pilot experimental field for exploring Nong'an oil shale�� At the same time��an eccentric-type casing pipe cutter and a three-jaw casing pipe fisher were invented to lift casing pipes�� The practical engineering demonstrated that such a technique has several advantages including simple proce- dures��reasonable approach��high efficiency and low cost�� Both eccentric-type casing pipe cutter and three-jaw cas- ing pipe fisher have been used in remoulding drainage wells with desired effect�� | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Keywords: production wells drainage wells casing pipe cutter fisher borehole cleaning | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
�ո����� ������ ����淢������ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DOI: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
������Ŀ: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ͨѶ����: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
�����: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
����Email: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
�ο����ף� | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
������������� | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Copyright by ������� |